How to Specify Kitchen Appliances for a New Home or Renovation
By David Rousso Jr., Principal · Pedini by Daruso · November 2026
The short answer: choose every appliance by exact model number before the cabinetry drawings are final, then give the cabinetry maker each model's current installation documents. Those documents set the opening sizes, the custom panels, the door swings, the ventilation, the utilities, and the access for service, and the cabinetry is built to them. In a renovation, check what the existing house and building allow before you choose.
In this article

Appliances are often treated as a shopping decision made near the end of a project. In a kitchen with built in cabinetry they are the opposite: they are the first measurements the cabinetry is drawn around. A refrigerator column, an oven stack, or an integrated dishwasher is an opening in the cabinetry with exact dimensions, a panel with a weight limit, a door that swings into the room, and a set of connections behind it. This guide explains how to specify them, using the planning documents that Miele, Sub-Zero, Wolf, and Gaggenau publish for the purpose.
What does it mean to specify kitchen appliances?
Short answer: to fix, for every appliance, the brand, the exact model number, and the documents that go with it, and to collect them in one appliance schedule. The schedule is what the cabinetry maker, the contractor, the electrician, the plumber, and the HVAC professional all work from.
A brand and a size are not a specification. Two refrigerator columns of the same nominal width from the same maker can need different openings, panels, and electrical supply. What the cabinetry needs is the model number and that model's current installation drawing or design guide. Manufacturers publish these for exactly this purpose: Miele's product pages, for example, say that you will find all the relevant installation drawings for the appliance there, and Sub-Zero directs designers to its design guide and its Reveal specification tool for panel and opening dimensions.
Line in the appliance schedule | What it fixes | Who uses it |
|---|---|---|
Brand and exact model number | Which installation documents apply | Everyone |
Opening (niche) dimensions | Width, height, and depth of the cabinet opening, with tolerances | Cabinetry maker |
Panel requirements | Custom panel size, thickness, maximum weight, handle | Cabinetry maker |
Door swing and hinge side | Clearance to walls, other doors, and walkways | Designer, cabinetry maker |
Ventilation | Air paths for the appliance; hood size, duct route, and makeup air for cooking | Cabinetry maker, HVAC professional |
Utilities | Electrical supply and outlet position, gas, water, drain | Electrician, plumber, contractor |
Service access | How the appliance comes out, where the shutoffs are | Cabinetry maker, installer |
Installer | Who sets and connects each appliance | Homeowner, contractor, dealer |
When should you choose your appliances?
Short answer: during design development, before the cabinetry drawings close and before the cabinetry goes into production. The appliances do not need to be delivered by then; the model numbers need to be final.
On our projects, design development runs from about the second to the fifth week and material selection and specification from about the fourth to the sixth, with production in Italy in roughly weeks 8 to 18, as we set out in how a bespoke Italian kitchen is made. The appliance list belongs in the first of those stages. Once the cabinetry is in production, a change of model means a change of opening, and the cabinet built for the first model may not take the second.
Stage | Appliance decision due |
|---|---|
First conversation and brief | How the household cooks; which appliances, and roughly what size and type |
Design development | Brand and exact model for every appliance, including the small built in ones |
Shop drawings | Current installation documents for each model; openings, panels, and air paths drawn to them |
Production | No changes; the openings and panels are being made |
Site rough in | Outlets, gas, water, drains, and ducts placed to the appliance documents |
Installation | Appliances set, connected, and panels fitted and aligned |
Manufacturers are clear that their published dimensions are the ones to build to. Sub-Zero states that it does not recommend or approve changes to any design or installation specification in its design guide, and that alternate dimensions, materials, or methods may lead to product damage, poor performance, or problems getting the installation approved. So the safe order is model first, drawing second.

What does each appliance ask of the cabinetry?
Short answer: an opening built to its exact dimensions, a panel within its weight and size limits if it is integrated, room for its door to open, a path for its air, its connections in the right place, and a way to get it out for service. Each manufacturer publishes these per model.
Refrigeration: Sub-Zero as an example
Integrated refrigeration disappears behind cabinet fronts, which means the cabinetry maker makes part of the appliance. Sub-Zero's design guides state that for integrated models, custom door panels and handle hardware must be provided, and they list a maximum weight for each panel by model, along with opening dimensions and handle depth. A panel heavier than the limit, or a handle that sits too deep, is a drawing problem before it is a hinge problem. Panel construction itself, the core, the thickness, and the hinge geometry, is covered in what is a panel ready appliance.
Dishwashers: Miele as an example
A fully integrated dishwasher takes a cabinet front in the same finish as the drawers around it. Miele publishes, model by model, the niche it needs and the weight its door can carry. For its 18 inch G 5892 SCVi SL, the product page lists a niche 17 3/4 inches wide, between 32 1/8 and 34 3/4 inches high, and 21 3/4 inches deep, and a front panel between 2 and 8 kilograms. A panel outside that range is the wrong panel for that dishwasher, however good it looks.
Ovens: Gaggenau as an example
Built in ovens need air. Gaggenau's planning notes for its 400 series ovens say that when the ovens are installed flush, they need a reveal of at least 3/8 inch for proper ventilation, and that the doors then open to 90 degrees rather than 180. The same notes recommend at least 1 3/16 inches between those ovens and a cooling appliance, and say that an oven installed behind cabinet doors may only be operated with those doors open. Each of these is a cabinetry dimension, and each is lost if the oven model changes after the drawings close.
Cooking surfaces: Wolf as an example
The cooktop or range sets the hood, and the hood sets the cabinetry around it. Wolf's ventilation guide says a wall hood should be at least as wide as the cooking surface, and an island hood should exceed it by at least 3 inches on each side; a downdraft should match the width of the cooktop. It gives mounting heights by hood type, for example 30 to 36 inches from the counter to the bottom of a pro hood.

How do door swings and landing space work?
Short answer: every appliance door needs room to open fully without hitting another door, a wall, or a person, and a clear counter beside it to set things down. The NKBA guidelines say no entry door should interfere with the safe operation of an appliance, and appliance doors should not interfere with one another.
Door swings are where a correct opening can still fail. A refrigerator door that opens against a wall may not open far enough for the drawers inside to come out; an oven door that drops into the same aisle as an open dishwasher blocks the cook. Draw each door in its open position on the plan, with the hinge side confirmed for the exact model.
NKBA guideline | Recommendation |
|---|---|
Refrigerator landing area | 15 inches on the handle side, or within 48 inches across from it |
Cooking surface landing area | 12 inches on one side and 15 inches on the other |
Oven landing area | 15 inches next to or above it, or within 48 inches across if the oven does not open into a walkway |
Microwave landing area | 15 inches above, below, or beside the handle side |
Dishwasher | Within 36 inches of the sink, with 21 inches of standing space beside it |
Cooking surface | Not under an operable window |
An island adds aisles on every side, and an open appliance door takes part of the aisle while it is open; we set out the dimensions in how much space a kitchen island needs.
What does ventilation require?
Short answer: a correctly sized hood ducted to the outside, sized from the cooking appliance's output and the room. The NKBA guidelines recommend at least 150 cubic feet per minute, note that the code minimum for a ducted hood is 100, and note that hoods able to exhaust more than 400 cubic feet per minute must have makeup air.
Ventilation is the one appliance decision that reaches outside the kitchen. The duct has to leave the building, and air has to come back in to replace what the hood removes. The NKBA guidelines summarize the code: range hoods discharge outdoors through a duct, never into an attic, soffit, or crawlspace, and makeup air enters the same room as the hood. Wolf's ventilation guide advises consulting a qualified HVAC professional for the installation and ducting, and notes that makeup air may be needed. Its recommendations are for performance; the code and the building decide the rest.
In the cabinetry, ventilation sets the hood width, the depth of the cabinets beside it, and any soffit or chase the duct runs through. A downdraft rises from behind the cooktop and needs room in the base cabinet below for its blower and duct.

Utilities and service access
Short answer: every appliance needs its power, gas, water, and drain in the positions its installation document shows, placed at rough in; and every appliance has to be removable for service without taking the cabinetry apart.
Utilities
The installation documents show where each connection should be. Some put the electrical outlet outside the appliance opening altogether: Gaggenau's models and dimensions guide notes, for several of its ovens, that the mains socket needs to be planned outside the built in niche. Countertop receptacles need ground fault protection under the code, as the NKBA guidelines note, and outlets are not to be installed face up in a countertop. In a house, these are set at rough in from the appliance schedule; in a condominium, gas and new circuits may also need the building's approval.
Service access
Every appliance will one day need a repair or a replacement. Plan so that each one can be slid out of its opening with its panel removed, without cutting a countertop or dismantling the cabinets beside it, and so that its water shutoff and electrical disconnect can be reached. Miele's product pages say its appliances should only be installed and maintained by authorised experts; a service technician needs to be able to get to the appliance to do that.

Renovation or new construction: what changes?
Short answer: in new construction, the appliance schedule decides where the utilities go. In a renovation, the existing house and building decide which appliances will fit, so check the constraints before choosing the models.
Question | New construction | Renovation |
|---|---|---|
Openings | Drawn to the chosen models | Existing walls, windows, and structure may limit width and height |
Ventilation | Duct route planned with the architect | The duct route to outside may be limited or unavailable; in a condominium it needs the association's approval |
Electrical and gas | Sized for the schedule from the start | Existing service may limit new circuits; gas may not be available |
Water and drain | Placed at rough in | On a concrete slab, a new drain location means cutting the floor |
Delivery | Through the open structure | Doorways, elevators, and building hours set what can be brought in |
Timing | Appliance schedule before rough in | Appliance schedule before demolition, so surprises change the design rather than the build |
In a high rise, the building's rules come first; we walk through the approval sequence in planning a condo renovation in Miami.
Who is responsible for what?
Short answer: the homeowner and designer choose the models; the appliance dealer supplies the current documents and the order; the cabinetry maker draws and builds to those documents; the architect and contractor route the utilities; an HVAC professional sizes the ventilation; and the installer sets and connects each appliance to the manufacturer's instructions.
Party | Responsible for |
|---|---|
Homeowner and designer | Choosing each appliance by exact model, in time for the drawings |
Appliance dealer | Current specification sheets and installation documents; the order and delivery date |
Cabinetry maker | Openings, panels, air paths, and access drawn and built to those documents |
Architect and contractor | Utilities, structure, permits, and the duct route |
HVAC professional | Hood capacity, duct sizing, and makeup air |
Installer | Setting, connecting, and testing each appliance to the manufacturer's instructions |
The one gap to close in writing is the last line: who sets and connects each appliance, and who fits its panel. It varies from project to project, and an appliance that arrives with no one named to install it waits in its box. On our side, we draw the openings and panels to the documents and make the panels in Italy with the rest of the cabinetry, so they arrive in the same finish as the doors around them.
“An appliance list is a set of measurements. If we have the model numbers when we draw, the kitchen is built around them once. If they arrive after the drawings close, something gets rebuilt or filled in, and the filler is the part everyone notices.” — David Rousso Jr., Principal, Pedini by Daruso
What do our own projects show?
Short answer: that three of the four brands in this guide appear often in our kitchens. Of the 35 project pages on our site, the photo descriptions name Wolf in 8, Miele in 6, and Sub-Zero in 2. None names Gaggenau, so the Gaggenau examples here come from Gaggenau's own planning notes. Counted on November 17, 2026.
Wolf appears in Pinecrest IX, Fort Lauderdale II, and Island Estates, among others; Miele in Manalapan, Miami Beach, and South Pointe; Sub-Zero in Coral Gables III and Pinecrest X. A photo description names a brand only where it shows, so these counts are a floor, not a full record of the appliances we have built around.
Appliance schedule checklist
List every appliance. Including the small built in ones: coffee machine, warming drawer, microwave, wine refrigerator, ice maker.
Fix the exact model number for each, not just the brand and width.
Download the current installation documents for each model and send them to the cabinetry maker.
Mark integrated appliances and note each panel's size, thickness, maximum weight, and handle.
Draw every door open on the plan, with the hinge side, and check it against walls, other doors, and aisles.
Check the landing areas beside the refrigerator, cooking surface, ovens, microwave, and dishwasher.
Size the ventilation with an HVAC professional: hood width, capacity, duct route, and makeup air.
Place the utilities to the documents: outlets, gas, water, and drains, at rough in.
Plan service access so each appliance can come out without dismantling the cabinetry.
Name the installer for each appliance and each panel, in writing.
In a renovation, check the building first: duct route, electrical capacity, gas, delivery, and association approval.
Bring the list to a first meeting; what else to bring is in our Design District showroom guide.
Frequently asked questions
When should I choose kitchen appliances in a renovation?
During design development, before the cabinetry drawings close and before production starts. In a renovation, check the existing duct route, electrical capacity, and gas supply first, because they limit which models will work.
Do I need to buy appliances before the cabinets are made?
No. You need the exact model numbers and their current installation documents. The appliances themselves can be ordered to arrive for installation.
What is an appliance schedule?
A single list of every appliance in the kitchen with its brand, exact model, opening dimensions, panel requirements, door swing, ventilation, utilities, service access, and installer. The cabinetry maker, contractor, and trades all work from it.
What happens if I change an appliance after the cabinets are ordered?
The opening, panel, and connections were drawn for the first model, so the new one may not fit. The cabinet may need to be remade, or the gap closed with a filler panel.
Who makes the panels for integrated appliances?
The cabinetry maker, to the appliance manufacturer's panel requirements. Sub-Zero, for example, states that custom door panels and handle hardware must be provided for its integrated models, within a maximum weight per panel.
How much space does an appliance door need?
Enough to open fully without hitting a wall, another door, or blocking an aisle. The NKBA guidelines say appliance doors should not interfere with one another, and recommend landing space beside each appliance, such as 15 inches on the handle side of a refrigerator.
How wide should a range hood be?
Wolf's ventilation guide says a wall hood should be at least as wide as the cooking surface, and an island hood should exceed it by at least 3 inches on each side.
Does a kitchen hood need makeup air?
Hoods able to exhaust more than 400 cubic feet per minute must be provided with makeup air under the residential code, as the NKBA guidelines summarize. An HVAC professional should size the hood, the duct, and the makeup air together.
Do built in ovens need ventilation space?
Yes. Gaggenau's planning notes for its 400 series ovens, for example, call for a reveal of at least 3/8 inch around flush installed ovens so they can draw cooling air, and note that the doors then open to 90 degrees.
How is specifying appliances different in a condo?
The building decides more. A new duct route, a gas line, or a new circuit may need the association's approval, and deliveries depend on the building's elevators and hours. Check those before choosing the models.
Who installs the appliances?
It varies by project: the dealer's installer, a certified installer, or the trades the contractor appoints. Name who sets and connects each appliance, and who fits each panel, in writing before installation is scheduled.
How do I make sure appliances can be serviced?
Plan each opening so the appliance can be slid out with its panel removed, without cutting the countertop or dismantling the cabinets beside it, and keep its water shutoff and electrical disconnect reachable.
Key takeaways
Fix every appliance by exact model number before the cabinetry drawings close.
Give the cabinetry maker each model's current installation documents; build to them without changes.
Each appliance needs six things from the cabinetry: opening, panel, door swing, ventilation, utilities, and service access.
In a renovation, check the duct route, electrical capacity, gas, and building approval before choosing.
Name, in writing, who installs and connects each appliance and who fits each panel.
Bring your appliance list
Bring your floor plan and your appliance list, even if it is only brands and sizes so far, and we will show you what each one asks of the cabinetry. Book a design consultation, visit our Miami Design District showroom at 3639 NE 1st Ave, Unit 135, (305) 853-9598, or our Coral Gables showroom at 250 Altara Ave, (786) 772-6770. Finished kitchens are on our projects page and in our kitchen collections.
About the author. David Rousso Jr. is a Principal at Pedini by Daruso, where he leads kitchen and millwork projects across South Florida from showrooms in the Miami Design District and Coral Gables.
Sources (each checked November 17, 2026):
NKBA, Kitchen Planning Guidelines with Access Standards: Guideline 2, door interference; 13, dishwasher within 36 inches of the sink and 21 inches of standing space; 16, 17, 22, 23, landing areas; 18, cooking surface clearance; 19, ventilation (150 cfm recommended, 100 cfm code minimum ducted outdoors, makeup air above 400 cfm); 20, no cooking surface under an operable window; 30, receptacle protection.
Sub-Zero, Integrated Refrigeration Design Guide answer and Sub-Zero Design Guide answer: no approval of changes to published specifications; panel weight, panel and opening dimensions, handle depth; Reveal tool.
Wolf, Ventilation Guide (revised March 2024): hood width, island overlap, downdraft width, mounting heights, HVAC professional, makeup air.
Miele, G 5892 SCVi SL fully integrated dishwasher: niche dimensions; front panel 2 to 8 kg; installation drawings; installation and maintenance by authorised experts.
Gaggenau, 400 series oven planning notes (revised March 2025): 3/8 inch reveal for flush installation; 90 degree door opening; 1 3/16 inches from cooling appliances; operation behind cabinet doors only with the doors open. Gaggenau, Models and Dimensions 2025: mains socket planned outside the built in niche.
Pedini by Daruso, Projects: photo descriptions on all 35 project pages, counted November 17, 2026.
Last updated November 2026.